SIZE BY SIZE MATERIAL BALANCING - METALLURGICAL ACCOUNTING
Reconcile measured stream mass flow rates and elemental assays for each particle-size fraction class.
To use:
✅Enter the number of nodes (with a minimum of 2).
✅Enter the number of streams.
✅Enter the number of size fraction classes to be balanced.
✅Enter the number of assayed elements to be balanced.
✅Click on "1. Create Input Tables".
✅Enter the streams origin, destination, measured flow rate and percent error for each size class.
✅Enter the elemental assays and associated percent relative error for each stream and size class.
✅Ensure there is redundancy (enough number of equations) to solve the regression calculations.
✅Click on "2. Run Material Balance".